The first part of 25 Strand was built around 1688, the year that William of Orange landed his artillery and supplies at Topsham quay in his successful campaign to become King of England, and just over 20 years after the Great Fire of London! Its timbers are made of oak, cut around the time Isaac Newton published his treatise on physics. The walls are a mix of traditional cob, local stone and brick. Nearly 350 years of salty wind and rain have degraded these materials.
Cob is an ancient building material, made by mixing soil with straw and water (and a bit of cow dung for good measure). At some point in the past, cement render was used to protect or repair the walls. Cement is rigid and prone to cracking, allowing moisture to become trapped. It gradually caused rot that compromised the integrity of the wall. Works to address this began in September 2024. After removing cement render on the Strand and Lower Shapter Street elevations, further investigation revealed widespread structural repairs were essential. Exeter City Council closed the museum in October 2024, for these critical renovation works. The planning statement which details the problems and necessary repairs is available here. The detailed schedule of works can be seen here.



